Fourth District Addresses CEQA Baseline Issues In Partially Published Opinion Upholding EIR For Carlsbad Shopping Mall Renovation
Related news
- Fourth District Belatedly Publishes CEQA Opinion Upholding City of Newport Beach’s Approval of Multifamily-Housing Development Pursuant To Addendum To 2006 EIR For Larger Mixed-Use Developmentjdsupra.com
- Back To CEQA Basics: Second District Teaches That CEQA Requires Judicial Deference To Lead Agency’s Chosen Baseline, Failure To Administratively Exhaust “Exact Issue” Results In Forfeiture, And An EIR Is Not Faulty For Omitting Immaterial Informationjdsupra.com
- Refinery EIR Upheld Against Challenge to Baselinejdsupra.com
- CEQA Remedies Go Both Ways: Fourth District Reverses Judgment Upholding San Diego County Board’s Decision Granting Project Opponents’ Administrative Appeal, Holds Board Erred In Finding CEQA Guidelines Section 15183 Statutory Exemption Inapplicable And Ordering EIR Prepared for Exempt Industrial Projectjdsupra.com
- Reliance on 1998 EIR Under CEQA Upheld Based on Substantial Evidencejdsupra.com
- Depublication of CEQA EIR Project Description Detail Case Sought by CSAC and League of Citiesjdsupra.com
- CEQA Project Baseline Should Not Have Been Set Prior to Demolition of Historic Structurejdsupra.com
- First District Rejects CEQA Challenges To EIR For Petaluma River Apartment Project, Upholds Special Status Species Baseline And Public Safety/Emergency Access Impacts Analyses As Supported By Substantial Evidencejdsupra.com
- The Curious Case of the EIR Without A “Project”: Third District Rejects CEQA, Statutory Challenges To DOGGR’s “Unique” S.B. 4-Mandated EIR Analyzing Statewide Fracking/Well Stimulation Impactsjdsupra.com
- CEQA “Common Sense” Exemption Upheld; Environmental Baseline for Project Following Improvements Pursuant to an Emergency Exemption Clarifiedjdsupra.com
- “Growing Pains”: First District Holds Program EIR for San Francisco’s General Plan Housing Element Amendment Complies with CEQAjdsupra.com
- Second District Affirms Judgment Upholding Water Code CEQA Exemption, Rejects Plaintiff’s Attempt To Extend CEQA Review And Findings Requirements To Regional Water Board’s Approval Of Waste Discharge Permitsjdsupra.com
- Second Appellate District Expands Baseline Analysis in Upholding Environmental Impact Report for Refinery Project Intended to Help Reduce Air Pollutantsjdsupra.com
- Deficient CEQA Guidelines Appendix F Energy Impacts Analysis Causes First District To Pull The Plug On Ukiah Costco Project EIRjdsupra.com
- CDFA Program EIR Violates CEQA By Failing To Analyze Invasive Moth Control Program As Alternative To Eradication, Holds Third Districtjdsupra.com
- Leaving Bad Law “On The Books”: Supreme Court Denies Depublication of CEQA EIR Project Description Case That Promotes Piecemeal Litigationjdsupra.com
- Responsible Agency Under CEQA Must Make Express Findings as to Each Potentially Significant Impact Identified in Lead Agency’s EIRjdsupra.com
- CA Court Upholds Refinery Project EIR Reaffirming Foundational CEQA Principlesjdsupra.com
- Arguing Impacts By Proxy: Fourth District Holds CEQA Does Not Require EIR Absent Evidence That Subdivision Approval Actually Violated Applicable Land Use Regulations Adopted to Mitigate Environmental Impactsjdsupra.com
- Lost in Translation: Supreme Court Elucidates CEQA GHG Analysis, “Fully Protected” Species Take Prohibition, And Issue Exhaustion In Decision Finding Newhall Ranch Development EIR Flawedjdsupra.com