Article

timesofmalta.comtimesofmalta.com on 2020-01-17 14:38

Road contractor made to resurface Rabat road - Infrastructure Malta

Infrastructure Malta has ordered the contractor who surfaced Triq Ġorġ Borg Olivier in Rabat to resurface the road because it did not meet their ...

Related news